Pouring A Footing |
Pakmix Concrete Mix is a specially formulated blend of Portland cement, sand and gravel ideal for use where a thickness of 2" or greater is required. All ingredients are thoroughly premixed to ensure maximum strength and workability.
|
Tools Needed For Project: |
|
|
|
Step #1:

Dig a hole for the footing. Always make sure the footing is below the frost line and the base is solid and compacted.
|
Step #2:

Now, mix the Pakmix Concrete Mix. Follow the directions on the bag. Mix to a smooth consistency. Avoid a soupy mix as too much water decreases the strength and durability.
|
Step #3:

Place the concrete into the hole, and fill to the desired level, and use the float to provide a smooth, even surface.
|
Step #4:

To make sure your footing cures correctly, keep it moist with a fine mist from your garden hose. Then cover with an opaque plastic or burlap. Repeat this process 2-3 times a day for 3 days.
|
|
Suggested Uses:
- Setting Posts
- Deck Supports
- Footings
- Curbs
|
- Sidewalks
- Steps
- Patios
- Concrete Floors
|
|
|
Packaging & Yields:
- 80lb. bag yields approximately 3 1/2 sq. ft., 2" thick or approximately 3/5 cu. ft. wet volume.
- 60lb. bag yields approximately 2 1/2 sq. ft., 2" thick or approximately 9/20 cu. ft. wet volume.
- 50lb. bag yields approximately 2 sq. ft., 2" thick or approximately 4/10 cu. ft. wet volume.
- 40lb. bag yields approximately 3 1/2 sq. ft., 1" thick or approximately 3/10 cu. ft. wet volume.
|
|
Please Read The Warning On All Packaging |